Our Projects References

Click on Project Photos to view details

  • Re-configuration of Raffles City Shopping Complex

    Re-configuration of Raffles City Shopping Complex

  • MRT Contract 855

    Bored Piling

  • Tanglin Road Bungalow

    House Upgrading

  • Singapore Changi Airport Terminal 1 Upgrading Project NTUC Supermarket

    Demolish part of existing slab and beam above the Terminal 1 NTUC Supermarket. (Phase 10)

  • Proposed A&A to Meritus Mandarin Hotel @ Orchard Road

    Full controlled demolition workscope from Basement 2 to 6th Storey for new retail podium. Scope of Work: General hacking, removal, stripping down of existing interior finishes and components. And structural demolition covering structural elements as slab, beams, columns, walls, lift, staircase, etc. In addition to which are RC wall strengthening, beam penetration for strengthening, swimming pool demolition, M&E openings, and others.

  • Republic Polytechnic

    Removal of Cantilever shelter

  • Singapore Changi Airport Terminal 1 Upgrading Project

    General hacking, removal, stripping down of existing interior finishes and components. And structural demolition covering structural elements as slab, beams, columns, walls, lift, staircase, etc. In addition to which are RC wall strengthening, beam penetration for strengthening, swimming pool demolition, M&E openings; etc.

  • A&A works to Suntec City

    Demolish existing architecture and dismantle existing architecture finishes.

  • Demolition Works for M/s Sakuma Factory, Thailand

    Partial demolition of  ground slab for M/s Sakuma Factory, in Bangkok Thailand; for reconstructing of a new slab. Production activities remain in operation, such that normal hacking works were strictly not allowed. Demolition works were carried out by using coring and power saw cutting machines to accommodate this requirement.

Page