• E-mail: ginlee86@singnet.com.sg
  • Phone: (65) 6282 6686
  • Fax: (65) 6288 6616
  • E-mail: ginlee86@singnet.com.sg
  • Phone: (65) 6282 6686
  • Fax: (65) 6288 6616

Ngee Ann Polytechnic

Ngee Ann Polytechnic

As with all other demolition projects, the major concerns involved control of environmental issues such as dust, vibration and noise. With the controlled demolition works’ proximity to parts of the institutions that are in operation, the challenge had been to effectively address the said environmental concerns.  With limited time to accomplish our specialised works; preparation details and every single step under respective method statements need to be duly followed.

By |2018-10-19T11:17:19+08:00October 19th, 2018|Institution|0 Comments

About the Author:

Leave A Comment